البحث

Implementation of mechanized asphalt with a finisher machine in the streets of Abhar city , Yadgar Imam Blvd. pavement construction project , pavement construction project on 15 Khordad Street and Azadegan Blvd, to improve and restore the sidewalks of roads in Se Abhar district , to improve and restore the sidewalks of roads in the 4th district of Abhar,and Implementation of the continuation of the Farhangsara building construction project in Se Abhar district (EXPIRED)

طلب تقديم عروض

معلومات عامة

   يوليو 13, 2024
   عربى
   أخرى
   منشور: يوليو 13, 2024

النص الأصلي

sub - Implementation of mechanized asphalt with a finisher machine in the streets of Abhar city , Yadgar Imam Blvd. pavement construction project , pavement construction project on 15 Khordad Street and Azadegan Blvd, to improve and restore the sidewalks of roads in Se Abhar district , to improve and restore the sidewalks of roads in the 4th district of...
خيارات العضوية

أساسي

كامل

شركة

550 دولارا/سنة

1000 دولارا/سنة

التكلفة عند الطلب

شراء شراء اتصل بنا
يرجى ملاحظة أن هذا الإِشعار لمعلوماتك فقط.
نحن نبذل قصارى جهدنا لتوفير أحدث المعلومات وأكثرها دقة على موقع الويب الخاص بنا، ولكننا لا نستطيع ضمان خلو كل المعلومات المتوفرة من الأخطاء.
إذا كانت لديك أية اقتراحات خاصة بتحديثات/تصحيحات لهذا الإشعار، تفضل بإخبارنا.