notice_summary_english: The Town of Edson is inviting tenders for Vision Park Phase 3 Development – Ball Diamond Construction (ITT CP2024-72-06). The scope includes site grading, topsoil and sod installation, shale recovery and placement, and landscape maintenance for Diamond 9, which must be completed by June 30, 2025, ahead of a scheduled provincial championship. Additional work on Diamonds 3, 4, and 25 involves topdressing, overseeding, weed control, and turf establishment, continuing throughout the 2025 growing season. All work must adhere to drawings and specifications by EDS Group Inc., with submissions due by April 23, 2025, at 2:00:59 PM MST. local_title: Ball Diamond Construction Vision Park Phase 3 Development contract_duration: 0 Year(s) — 21 Week(s) — 1 Day(s) notice_contract_type: Service local_description: The Town of Edson is inviting tenders for Vision Park Phase 3 Development – Ball Diamond Construction (ITT CP2024-72-06). The scope includes site grading, topsoil and sod installation, shale recovery and placement, and landscape maintenance for Diamond 9, which must be completed by June 30, 2025, ahead of a scheduled provincial championship. Additional work on Diamonds 3, 4, and 25 involves topdressing, overseeding, weed control, and turf establishment, continuing throughout the 2025 growing season. All work must adhere to drawings and specifications by EDS Group Inc., with submissions due by April 23, 2025, at 2:00:59 PM MST. tender_contract_end_date: 2025-09-30 00:00:00 tender_contract_start_date: 2025-05-05 00:00:00 category: Grass and forage seeds and seedlings,Dirt and soil,Land and soil preparation,Site preparation services,Park and garden construction and or remodelling service
|
|