البحث

Carrying Out Construction And Assembly Works As Part Of The Investment Titled: "Expansion And Reconstruction Of The Building Of The Świętokrzyskie Hospital, Pediatric Center, Adding A Provincial Children'S Clinic As Part Of The Investment "Strengthening Outpatient Specialist Care In The Provincial Hospital In Kielce (EXPIRED)

طلب تقديم عروض

معلومات عامة

بولندا
   00303979-2026
   مايو 5, 2026
مايو 15, 2026
  
Wojewódzki Szpital Zespolony w Kielcach
   البولندية
   شراء دولي
   منشور: مايو 5, 2026

معلومات الاتصال

   Dział Zamówień Publicznych
Wojewódzki Szpital Zespolony w Kielcach
ul. Grunwaldzka 45
Kielce
بولندا
   +48413671339
   انقر هنا

البضائع والأشغال والخدمات

أعمال بناء مرافق المستشفيات تركيب إطارات الأبواب والنوافذ أعمال التفكيك تركيب إطارات الأبواب تركيب الأبواب والنوافذ

Additional resources

الملخص

      

notice_summary_english: The subject of the order is the execution of construction and installation works in order to implement an investment consisting in the expansion and reconstruction of the building of the Świętokrzyski Hospital, Pediatric Center, with a hospital clinic for children as part of the project titled "Expansion and reconstruction of the building of the Świętokrzyskie Hospital Center for Pediatrics (building registry no. 2437) with a Provincial Children's Clinic "Strengthening outpatient specialist care in the Provincial Hospital in Kielce", on plots registry no. 389/10, 389/11, 389/12, 389/13, precinct 0015, in the area of ul. Grunwaldzka 45 and ul. President Stefan Artwiński in Kielce. Information on the rules for the implementation of the subject of the contract, guarantees and remuneration is included in: Annex No. 8 to the SWZ - Description of the subject of the contract, Annex No. 3 to the SWZ - Draft provisions of the public procurement contract. The contractor is obliged to perform the order in compliance with the principles of environmental protection and sustainable development, in accordance with the DNSH principle.
In particular, the contractor will ensure:
• that the transport of materials, devices and equipment, the packaging used and the method of delivery reduce pollutant emissions, noise and the amount of waste generated;
• that the construction materials, devices and equipment used and supplied meet applicable environmental requirements, including - where applicable - requirements arising from RoHS, REACH and energy efficiency principles;
• that waste generated during the execution of the order, including construction waste and waste electrical and electronic equipment, will be managed in accordance with the regulations on waste and WEEE, with selective collection and transfer of waste only to authorized entities;
• use of materials and work technologies with the lowest possible impact on the environment,
in particular materials

النص الأصلي


More information: انقر هنا
يرجى ملاحظة أن هذا الإِشعار لمعلوماتك فقط.
نحن نبذل قصارى جهدنا لتوفير أحدث المعلومات وأكثرها دقة على موقع الويب الخاص بنا، ولكننا لا نستطيع ضمان خلو كل المعلومات المتوفرة من الأخطاء.
إذا كانت لديك أية اقتراحات خاصة بتحديثات/تصحيحات لهذا الإشعار، تفضل بإخبارنا.