Parties A - Statics: Construction Of A School Building In Wood Construction (Building E) The Building Is To Be Designed In Skeletal Construction. Kind Data: 107 M³ Of Bars And Supports Made Of Board Perrwood 259 M³ Of Wooden Ceilings Made Of Board Wood 1,050 M² Ceilings In The Form Of Hollow Box Elements Construction Of A Technology Floor (Building B) The Technical Floor Is To Be Built On A Reinforced Concrete Structure. Parties B- Technology: Delivery And Laying Of +/- 345 M Ict Tube Delivery And Laying Of +/- 60 M Hdpe Tube With Insulation Game C- Architecture: Roughly 1500 M² Flat Roof Sealing Work With Epdm Foils Approx. 1400 M² Roof Greening Approx. 235 M Rope Protection System Approx. 1,200 M² Rear-Ventilated Facade With Blow-In Insulation And Wooden Slats Approx. 260 M² Wooden Facade (Not Insulated) On Technology Boxes Approx. 60 M² Wood Covering On Loggia And Balcony Approx. 20 M Glass Railing On Loggia And Balcony Approx. 70 M² Etics On Ceiling Surfaces Approx. 70 M² Outdoor Plaster 2-3 Mm Approx. 22 Pieces Post-Bar Elements Wood-Aluminum With Approx. 3-11 Pieces Of Parietal Window And Fixed Glazing Approx. 5 Pieces Of Post-Bar Elements Wood-Aluminum With Fixed Glazing 26 Pieces Of Offshore Systems For Window Elements Approx. 3 Pieces Of Post-Bar Elements Wood-Aluminum Input Situation With Outer Door Elements Approx. Holz-Alu Approx. 8 Pieces Of Facade Ventilation Grille Alu Begin / Duration Of Work: March 2026/145 Working Days
طلب تقديم عروض
نحن نبذل قصارى جهدنا لتوفير أحدث المعلومات وأكثرها دقة على موقع الويب الخاص بنا، ولكننا لا نستطيع ضمان خلو كل المعلومات المتوفرة من الأخطاء.
إذا كانت لديك أية اقتراحات خاصة بتحديثات/تصحيحات لهذا الإشعار، تفضل بإخبارنا.