البحث

-The Purpose Of This Market Is To Build A Steel Railway Bridge, Part Of A New Jump-Out-Mouton Located South Of Bettembourg Station. This New Jump-De-Mouton Is Supposed To Avoid The Crossing Of The Bettembourg-Dudelange Line With Freight Trains From The West Of The Country And Entering The Sorting Of Bettembourg. - The Market Includes The Construction Of Reinforced Concrete Abutments, The Pre -Assembly Of The Steel Structure And The Shift In The Work On The Abutments. - Since The Work Is In Full Station And Since The Latter Must Remain In Service For Rail Traffic During The Work, With The Exception Of A Few Railway Dams Which Will Be Planned, Compliance With Deadlines And Safety At Work Is A Primordial Factor To Guarantee A Successful Completion Of The Work.

طلب تقديم عروض

معلومات عامة

   أكتوبر 2, 2025
   الفرنسية
   أخرى
   منشور: أكتوبر 2, 2025

النص الأصلي

var consulation_ref='537568';
var organisme = 't5y';
var depotAutomatique = 0;
var pageTransmissionAffichee = 0;
var jetonSignatureMaxFileSize = 1048576;





Détail de la consultation










Date et heure limite de remise des plis :


31/10/2025 10:00












Référence :


2502456









Intitulé :


Réaménagement de la Gare de...
خيارات العضوية

أساسي

كامل

شركة

550 دولارا/سنة

1000 دولارا/سنة

التكلفة عند الطلب

شراء شراء اتصل بنا
يرجى ملاحظة أن هذا الإِشعار لمعلوماتك فقط.
نحن نبذل قصارى جهدنا لتوفير أحدث المعلومات وأكثرها دقة على موقع الويب الخاص بنا، ولكننا لا نستطيع ضمان خلو كل المعلومات المتوفرة من الأخطاء.
إذا كانت لديك أية اقتراحات خاصة بتحديثات/تصحيحات لهذا الإشعار، تفضل بإخبارنا.